TDW · ClimateTech · Singapore, SG · Seed
Tidewatt
Grid-scale energy storage at one-third the cost of lithium, powered by the tide.
Pitch
Problem
The gap
Coastal grids across ASEAN are adding renewables faster than they can store them. Lithium is expensive, degrades, and carries fire and supply-chain risk. Without cheap long-duration storage, the energy transition stalls at the coast.
Solution
What Tidewatt does
Tidewatt builds modular gravity-tidal storage: we use predictable tidal motion to lift and release mass, storing energy mechanically. No rare earths, 30-year asset life, and a levelised cost ~1/3 of lithium for long-duration discharge.
Why now
The timing
ASEAN utilities now have binding renewable mandates, lithium long-duration economics remain broken, and our first 4MWh array has 18 months of real telemetry proving round-trip efficiency in the field.
About
Tidewatt builds modular gravity-tidal storage for coastal grids. First 4MWh array deployed off Jurong; LOIs from two ASEAN utilities. Accredited-only round under MAS rules.
Traction
- 4MWh pilot array deployed off Jurong, Singapore
- 81% round-trip efficiency sustained over 18 months
- Two binding utility LOIs (contingent on type certification)
- Zero capacity degradation observed to date
Use of funds
- Type certification40%
- 10MWh commercial array35%
- Engineering team15%
- Working capital10%
Milestones · 2 of 4 hit
- Pilot array live
- 2 utility LOIs
- Type certification
- 10MWh array
Gallery
Evidence
Pitch deck · 8 slides
Team
- LZLin Zhao
PhD marine engineering, NUS. Ex-Sembcorp offshore lead.
- MTMarcus Tan
Ex-Tesla Energy. Designed utility-scale storage controllers.
- PNPriya Nair
15 years ASEAN utility BD. Closed $400M in PPAs.
Data room
This room requires a signed NDA. 2 documents are available to members who sign.
Sign in to open the data roomQuestions from the circle
What's the round-trip efficiency vs. lithium at 10-year horizon, including degradation?
Updates
Updates from the founder
Nothing posted yet.
Discuss
No discussion yet.