Green & energy
☀️ Solar on the roof
30 to 60kW on a church, school or clinic; the savings split between the institution and the circle.
A 20-year asset on one roofmarket · Grant-stackable
$50,000 to $90,000to start
First savings on commissioningto first revenue
Near-total after installationgross margin
3/5difficulty
Why this works
Deeply on-mission and grant-stackable. The roof is free, the sun is free, and the institution's bill becomes the circle's yield.
The moat
The agreement with the institution. A roof under contract is a roof nobody else can sell to.
Scorecard
- Demand80
- Margins85
- Open field60
- Easy to start40
- Scalability60
- Circle fit95
Ready-made terms
$70,000target
$500minimum check
140backers fill it
Profit-shareinstrument · closes in 21 days
Use of funds
- Panels and inverters70%
- Installation and structure22%
- Metering and permits5%
- Float3%
Milestones
- Institution agreement signed
- Installer chosen
- Array commissioned
- First savings payout
Who pays
Institutions pay a large power bill every month and have a large empty roof. A 30 to 60kW array cuts the bill and the savings are split between the institution and the circle for twenty years.
What kills it
- Installer quality and warranties
- A savings-share contract written loosely
- Net-metering rules changing
- Roof condition surprises
How to start
- Pull twelve months of the institution's bills
- Get two installer quotes with warranties
- Sign a twenty-year savings-share agreement
- Commission it at a Live event and post the first bill side by side
The KARiFi angle
The before-and-after power bill is the most convincing slide the Den will ever show.
Start a circle around this